Part of the electricity for building tenants is supplied by the world’s first Pyrite wall solar installed on the wall of the building.
In addition, off-site PPA is also supplied from a farmland power plant installed in Hiroshima Prefecture.
Through this demonstration experiment
Joint project with JABABEKA.Preliminary installation of 5 CROAS® units in a no-power-supply zone in a development area in a special economic zone in JABABEKA.
Morotai Island
The island is designated as both a special economic zone and a special tourism zone, and has a population of about 80,000.
There is a lot of undeveloped land, and before the installation of CROAS®, power outages were common because the island was mainly powered by diesel and fuel was dependent on off-island sources.
CROAS construction works
5 CROAS® units were installed on a 2,000㎡ site prepared by JABABEKA in a special economic zone.
CROAS® construction completed
Completion of a complete off-grid power supply system with CROAS®.
Copra factory in JABABEKA industrial park lights up for the first time.